Translations:Regenwassernutzung/225/en
Aus INTEWA Wiki
According to the ground considerations approximately 10 cm should be excavated to prepare the subsurface for the placement of the cistern.
According to the ground considerations approximately 10 cm should be excavated to prepare the subsurface for the placement of the cistern.