Translations:Wasseraufbereitung und Grauwassernutzung/955/en: Unterschied zwischen den Versionen

Aus INTEWA Wiki
(Die Seite wurde neu angelegt: „Since the work is over a very large membrane surface area the pressure differential and required energy needs for filtration are low. Demonstration systems hav…“)
 
 
Zeile 1: Zeile 1:
Since the work is over a very large membrane surface area the pressure differential and required energy needs for filtration are low. Demonstration systems have shown an energy requirement of less than 2.5 kWh/m³. The expected lifespan of a membrane is now up to 10 years in comparison to 2 years for conventional technology.
+
Since the work is over a very large membrane surface area the pressure differential and required energy needs for filtration are low. Demonstration systems have shown an energy requirement of less than 2.5 kWh/m³.

Aktuelle Version vom 21. Februar 2019, 13:44 Uhr

Information zur Nachricht (bearbeiten)
Zu dieser Nachricht ist keine Dokumentation vorhanden. Sofern du weißt, wo und in welchem Zusammenhang sie genutzt wird, kannst du anderen Übersetzern bei ihrer Arbeit helfen, indem du eine Dokumentation hinzufügst.
Nachricht im Original (Wasseraufbereitung und Grauwassernutzung)
Damit sehr großen Membranoberflächen gearbeitet wird, sind die Druckdifferenzen und der benötigte Energiebedarf zur Filterung gering. Musteranlagen ergaben einen Energieverbrauch von unter 2,5 kWh/m³.
ÜbersetzungSince the work is over a very large membrane surface area the pressure differential and required energy needs for filtration are low. Demonstration systems have shown an energy requirement of less than 2.5 kWh/m³.

Since the work is over a very large membrane surface area the pressure differential and required energy needs for filtration are low. Demonstration systems have shown an energy requirement of less than 2.5 kWh/m³.